ढाँचा:Infobox bridge/कागजात
Usage
सम्पादन गर्नुहोस्{{{bridge_name}}} {{{native_name}}} | |
---|---|
[[File:{{{image}}}|{{{image_size}}}|alt={{{alt}}}|border]] | |
आधिकारिक नाम | {{{official_name}}} |
अन्य नाम | {{{other_name}}} |
बहन | {{{carries}}} |
पार गर्ने | {{{crosses}}} |
स्थान | {{{locale}}} |
स्वामित्व | {{{owner}}} |
अध्ययन गर्ने | {{{maint}}} |
ID number | {{{id}}} |
वेबसाइट | {{{website}}} |
वास्तुकार | {{{architect}}} |
डिजाइनर | {{{designer}}} |
इन्जिनियरिङ डिजाइन | {{{engineering}}} |
Successful competition design | {{{winner}}} |
Contracted lead designer | {{{contracted_designer}}} |
डिजाइन | {{{design}}} |
पद्धार्थ | {{{material}}} |
जम्मा लम्बाई | {{{length}}} |
चौडाई | {{{width}}} |
उचाईं | {{{height}}} |
लामो स्पान | {{{mainspan}}} |
Number of spans | {{{spans}}} |
Piers in water | {{{pierswater}}} |
तौल सिमा | {{{load}}} |
Vertical clearance | {{{clearance}}} |
तल निकासी | {{{below}}} |
Design life | {{{life}}} |
Constructed by | {{{builder}}} |
Fabrication by | {{{fabricator}}} |
सुरूवात मिति | {{{begin}}} |
समापन मिति | {{{complete}}} |
जम्मा लागत खर्च | {{{cost}}} |
खोलिएको | {{{open}}} |
उद्घाटन मिति | {{{inaugurated}}} |
टोल | {{{toll}}} |
Daily traffic | {{{traffic}}} |
Preceded by | {{{preceded}}} |
Followed by | {{{followed}}} |
Heritage status | {{{heritage}}} |
Collapsed | {{{collapsed}}} |
बन्द हुने समय | {{{closed}}} |
Replaces | {{{replaces}}} |
{{{map_cue}}} {{{map_text}}} | [[File:{{{map_image}}}|{{{map_width}}}|alt={{{map_alt}}}]] |
निर्देशांक | {{{coordinates}}} |
{{{extra}}} | |
References: {{{references}}} |
Copy and paste the template below:
{{Infobox bridge | bridge_name = | native_name = | native_name_lang = | image = | image_size = | alt = | caption = | official_name = | other_name = | carries = | crosses = | locale = | owner = | maint = | id = | id_type = | website = | architect = | designer = | engineering = | winner = | contracted_designer = | design = | material = | length = | width = | height = | mainspan = | spans = | pierswater = | load = | clearance = | below = | life = | builder = | fabricator = | begin = | complete = | cost = | open = | inaugurated = | toll = | traffic = | preceded = | followed = | heritage = | collapsed = | closed = | replaces = | map_cue = | map_image = | map_alt = | map_text = | map_width = | coordinates = | lat = | long = | extra = | references = }} |
Parameter descriptions
सम्पादन गर्नुहोस्Field | Description |
---|---|
bridge_name | Name of bridge |
native_name | Name of the bridge in the local language, if different |
native_name_lang | ISO code for the local language (e.g. "fr" for French). If more than one, enter the native names using {{Lang}} instead. |
image | Filename of image of the bridge |
alt | Alt text for bridge image (see WP:ALT) |
caption | Text for caption beneath image |
official_name | Official name |
other_name | Also known as name |
carries | Type of vehicles bridge carries |
crosses | Body of water or geographic feature that is being crossed |
locale | General area where located (e.g. San Francisco, Indiana-Kentucky State Line) |
owner | Persons or body that owns the bridge |
maint | Maintaining entity (e.g. California Department of Transportation) |
id | ID number, if available |
id_type | Label for the ID field. The default, if this parameter is not specified, is ID number (for the United States National Bridge Inventory) |
architect | Those responsible for the conceptual design of the bridge - to be used when engineering/construction design was done by another party |
designer | Bridge designer/architect (e.g. Isambard Kingdom Brunel) |
engineering | The person or organization that did the engineering/construction design, where that differs from 'designer' above |
winner | The winner/s of the design competition phase |
contracted_designer | The lead designer at the contract/post competition phase |
design | Type of bridge (cantilever, truss, suspension) |
material | Construction material (concrete, steel, iron, stone, brick, wood) |
length | Length of bridge, w/ conversions |
width | Width of bridge, w/ conversions |
height | Height of bridge, w/ conversions |
mainspan | Length of main span, w/ conversions |
spans | Number of spans or arches |
pierswater | Number of piers standing in a river or other water in normal conditions |
load | Load limit of the bridge, w/ conversions |
clearance | Clearance on top of the bridge, if proper |
below | Clearance beneath the bridge |
life | Design life of the bridge in years |
builder | Construction company or bridge builder |
fabricator | Steel fabricator |
begin | Construction begin |
complete | Construction end |
cost | Total project cost |
open | Opening date, use {{Start date}} |
inaugurated | the date the bridge is ceremonially opened |
toll | Price of the toll (if a toll bridge) |
traffic | Average Daily Traffic value |
preceded | Name of bridge upstream |
followed | Name of bridge downstream |
heritage | Heritage status (e.g. UK listed building) |
collapsed | If collapsed, then date of collapse, don't use closed - closure is assumed
|
closed | Closing date |
replaces | The bridge or ferry services that this bridge made redundant |
map_cue | Map title |
map_image | Filename of map image of bridge |
map_alt | Alt text for map image (see WP:ALT) |
map_text | Caption beneath map image of bridge |
map_width | Map width in a standard value (pixels, for example) |
coordinates | Latitude and longitude ** i.e. {{Coord|50|01|01|N|90|01|01|W|region:US_type:landmark|display=it}} |
lat | Latitude |
long | Longitude** (use either lat + long or {{Coord}} )
|
extra | Spare field for additional information |
references | References to de-clutter infobox |
Example
सम्पादन गर्नुहोस्Sydney Harbour Bridge | |
---|---|
बहन | Trains, Motor vehicles, pedestrians and bicycles |
पार गर्ने | Port Jackson |
स्थान | Sydney, New South Wales, Australia |
डिजाइन | Through arch bridge |
जम्मा लम्बाई | १,१४९ मी (३,७७० फिट) |
चौडाई | ४९ मी (१६१ फिट) |
उचाईं | १३४ मी (४४० फिट) |
लामो स्पान | ५०३ मी (१,६५० फिट) |
तल निकासी | ४९ मी (१६१ फिट) at mid-span |
सुरूवात मिति | 28 July 1923 |
समापन मिति | 19 January 1932 |
खोलिएको | Did not recognize date. Try slightly modifying the date in the first parameter. |
निर्देशांक | ३३°५१′०८″द॰ १५१°१२′३८″पू॰ / ३३.८५२२२°S १५१.२१०५६°E |
{{Infobox bridge | bridge_name = Sydney Harbour Bridge | image = Sydney Harbour Bridge from Circular Quay.jpg | carries = Trains, Motor vehicles, pedestrians and bicycles | crosses = [[Port Jackson]] | locale = [[Sydney]], [[New South Wales]], [[Australia]] | design = [[Through arch bridge]] | length = {{Convert|1149|m|ft|0|abbr=on}} | width = {{Convert|49|m|ft|0|abbr=on}} | height = {{Convert|134|m|ft|0|abbr=on}} | mainspan = {{Convert|503|m|ft|0|abbr=on}} | below = {{Convert|49|m|ft|0|abbr=on}} at mid-span | begin = 28 July 1923 | complete = 19 January 1932 | open = {{Start-date|19 March 1932}} | coordinates = {{Coord|33|51|08|S|151|12|38|E|region:AU-NSW_type:landmark|display=inline,title}} }}
Microformat
सम्पादन गर्नुहोस्The HTML mark up produced by this template includes an hCard microformat, which makes the place-name and location parsable by computers, either acting automatically to catalogue article across Wikipedia, or via a browser tool operated by a person, to (for example) add the subject to an address book. Within the hCard is a Geo microformat, which additionally makes the coordinates (latitude & longitude) parsable, so that they can be, say, looked up on a map, or downloaded to a GPS unit. For more information about the use of microformats on Wikipedia, please see the microformat project.
If the place or venue has an "established", "founded", "opened" or similar date, use {{Start date}} (unless the date is before 1583 CE).
If it has a URL, use {{URL}}.
hCard uses HTML classes including:
- adr
- agent
- category
- county-name
- extended-address
- fn
- label
- locality
- nickname
- note
- org
- region
- street-address
- url
- vcard
Geo is produced by calling {{coord}}, and uses HTML classes:
- geo
- latitude
- longitude
Please do not rename or remove these classes; nor collapse nested elements which use them.
When giving coordinates, please don't be overly precise. A typical 4-lane bridge (25m wide) requires 0.1 second or 0.0001° of precision.